ANALISIS FAKTOR PENANGANAN PANDEMI COVID-19, KINERJA OPERATOR, PERALATAN BONGKAR MUAT DAN EFEKTIVITAS LAPANGAN PENUMPUKAN TERHADAP PRODUKTIVITAS BONGKAR MUAT PETI KEMAS

Authors

  • Kurniawants Teguh Santoso Universitas Maritim AMNI
  • Achmad Fauzi Universitas Maritim AMNI
  • Andar Sri Sumantri Universitas Maritim AMNI

DOI:

https://doi.org/10.58192/profit.v1i4.325

Keywords:

Productivity of Loading and Unloading, Handling the Covid-19 Pandemic, Operator Performance, Loading and Unloading Equipment

Abstract

In this study, loading and unloading productivity is influenced by several factors including : handling of the Covid-19 pandemic, operator performance, loading and unloading equipment and stacking field effectiveness. These factors have an important role in increasing loading and unloading productivity. The population in this study were employees of PT. Salam Pacific Indonesia Lines Medan Branch with a total sample of 109 respondents. The data analysis used in this research is descriptive analysis and quantitative analysis, the data is analyzed using multiple linear regression analysis using the Application (SPSS) Version 25. The results of the t-test hypothesis testing indicate that the Covid-19 Pandemic Handling, Operator Performance, Loading and Unloading Equipment and Stacking Field Effectiveness partially positive and significant effect on loading and unloading productivity. Based on the results of the study, it is known that the research model of the multiple linear regression equation resulted in the following equation : Y = 0,329 + 0,177X1 + 0,178X2 + 0,231X3 + 0,380X4 + µ. From the equation results show that the Covid-19 Pandemic Handling variable (X1) has (t count 2,004 > t table 1,983), Operator Performance variable (X2) has (t count 2,085 > t table 1,983), the Unloading Equipment variable (X3) has (t count 2,467 > t table 1,983) and the Stacking Field Effectiveness variable (X4) has (t count 4,243 > t table 1,983). As for the value of Adjusted R2 = 0.604. This means that 60.4% of the variation in the dependent variable (Y), namely the Unloading Productivity is explained by the independent variables, namely the Covid-19 Pandemic Handling (X1), Operator Performance (X2), Loading and Unloading Equipment (X3) and Stacking Field Effectiveness (X4). The remaining 100% - 60.4% = 39.6%, influenced by other variables outside the study.

References

Aliyu, S. H., & Saputro, S. (2020). Evaluasi Dwelling Time di Terminal Peti Kemas Pelabuhan Tanjung Emas Semarang. Jurnal Rekayasa Lingkungan Terbangun Berkelanjutan. 1 (1), 13-20.

Arianto, D., & Sutrisno, A. (2020). Kajian Antisipasi Pelayanan Kapal dan Barang di Pelabuhan Pada Masa Pandemi Covid–19. Jurnal Penelitian Transportasi Laut, 22 (2), 97-110.

Barasa, L., Malau, A. G., Hidayat, A., & Purnamasita, L. (2018). Pengaruh Penggunaan Peralatan Bongkar Muat terhadap Produktivitas Bongkar Muat di PT. Pelindo II Cabang Pontianak. Jurnal Ilmiah Nasional Sekolah Tinggi Ilmu Pelayaran Jakarta. 11 (2).

Chrisnawati, Y., & Wiyanto, R. B. (2016). Pengaruh Idle Time Terhadap Produktivitas Bongkar Muat Pada PT. Mustika Alam Lestari. Jurnal Logistik D III Transportasi UNJ, 9 (1).

Fauci, A. S., Lane, H. C., & Redfield, R. R. (2020). Covid-19 - Navigating The Uncharted. New England Journal of Medicine, 382 (13), 1268-1269.

Ghozali, Imam. (2017). Aplikasi Analisis Multivariate dengan Program SPSS. Edisi Kedelapan, Badan Penerbit Universitas Diponegoro. Semarang. 2013. Aplikasi Analisis Multivariate dengan Program IBM SPSS 23. Edisi 8.

Ghozali, I. (2018). Aplikasi Analisis Multivariate Dengan Program IBM SPSS 25.

Gunawan, H., & Sianto, M. E. (2017). Analisis Faktor-Faktor yang Berpengaruh Terhadap Produktivitas Bongkar Muat Kontainer di Dermaga Berlian Surabaya (Studi Kasus PT. Pelayaran Meratus). Widya Teknik, 7 (1), 79-89.

Hamzah, A., & Nurdin, H. S. (2021, March). Economic Resilience of Fishermen Community During Covid-19 Pandemic. In IOP Conference Series : Earth and Environmental Science, (Vol. 715, No. 1, p. 012062). IOP Publishing.

Haqi, M., & Maulana, N. (2018). Penggunaan Container Crane Terhadap Produktivitas Bongkar Muat Petikemas di Terminal Nilam Serbaguna. Jurnal Baruna Horizon, 1 (1), 30-42.

Hartati M. Pakpahan, 2019. “Evaluasi Kinerja Yard Occupancy Ratio (YOR) Pelabuhan Tenau, Kupang”. Prosiding Nasional Rekayasa Teknologi Industri dan Informasi XIV Tahun 2019 (ReTII), November 2019, pp. 449-456.

Hariyadi, H. (2019). Proses Pembongkaran Container Domestik Di PT. Berlian Jasa Terminal Indonesia Raya. Karya Tulis.

Hasibuan, M. (2018). Organisasi dan Motivasi : Dasar Peningkatan Produktivitas. Jakarta : PT Bumi Aksara.

Hasoloan, A. (2017). Sistem dan Prosedur Operasional Pelayanan Kapal dan Barang Berbasis Online Pada PT. Pelabuhan Indonesia I (Persero) Cabang Pelabuhan Belawan. Publik Reform, 3 (2).

Jusna, J., & Nempung, T. (2016). Peranan Transportasi Laut Dalam Menunjang Arus Barang dan Orang di Kecamatan Maligano Kabupaten Muna. Jurnal Ekonomi UHO, 1 (1), 189-200.

Khan, M. I., Rahman, M., Sarker, M., & Hasan, I. (2013). Digital Watermarking For Image Authentication Based on Combined DCT, DWT and SVD Transformation. arXiv preprint arXiv : 1307.6328.

Lasse, D. A. (2017). Manajemen Kepelabuhanan. Jakarta : Rajawali Pers.

Malayu, S. P. Hasibuan. (2012). Manajemen Sumber Daya Manusia. Jakarta : PT Bumi Aksara.

Marzuki, S., & Wair, F. Y. (2020). Kinerja Operator dan Kehandalan Alat HMC Terhadap Produktivitas Bongkar Muat Curah Kering. Majalah Ilmiah Bahari Jogja (MIBJ). 18 (1), 23-36.

Mulyadi, D. (2017). Studi Kebijakan Publik dan Pelayanan Publik : Konsep dan Aplikasi Proses Kebijakan Publik Berbasis Analisis Bukti Untuk Pelayanan Publik.

Moechamad, A. K. A. (2021). Analisis Faktor-Faktor yang Mempengaruhi Lamanya Waktu Tunggu (Waiting Time) Kapal Di Pelabuhan Dwikora Pontianak. Skripsi.

Nunnaly, J. 1967. Psychometric Methods. New York. McGraw-Hill.

Nurhadini, A., Rafie, & Indrayadi, M. (2018). Optimasi Pelayanan Bongkar Muat Peti Kemas di Pelabuhan Dwikora Pontianak. Jurusan Teknik Sipil, Universitas Tanjungpura, Pontianak.

Pakpahan, H. M., (2019). Evaluasi Kinerja Yard Occupancy Ratio (YOR) Pelabuhan Tenau, Kupang. Prosiding Nasional Rekayasa Teknologi Industri dan Informasi XIV Tahun 2019 (ReTII). 449-456.

Prasetyo, A. B., & Setiono, B. A. (2020). Pengaruh Covid-19 Terhadap Produktivitas Bongkar Muat di BUP PT. DABN Cabang Probolinggo. Jurnal Aplikasi Pelayaran dan Kepelabuhanan, 11 (1), 75-85.

Prastyorini, J., & Seprianor. (2018). Sistem Kerja Terusan dan Borongan Terhadap Produktivitas Kegiatan Bongkar Muat. Sekolah Tinggi Ilmu Administrasi dan Manajemen Kepelabuhanan (STIAMAK) Barunawati Surabaya. 1(1).

PT. Salam Pasific Indonesia Lines. (2010). Peraturan Perusahaan PT. Salam Pasific Indonesia Lines. HRD. Surabaya.

Putra, A., & Djalante, S. (2016). Infrastructure Development. Jurnal Ilmiah Media Engineering (ejournal. unsrat. ac. Id, Vol. 6, 433-443.

Republik Indonesia. (2008). Undang-Undang Republik Indonesia Nomor : 17 Tahun 2008 Tentang Pelayaran. Presiden Republik Indonesia. Jakarta.

Republik Indonesia. (2021). Peraturan Menteri Perhubungan Republik Indonesia Nomor : PM. 59 Tahun 2021 Tentang Penyelenggaraan Usaha Jasa Terkait Dengan Angkutan di Perairan. Menteri Perhubungan Republik Indonesia. Jakarta.

Salinding, R. (2011). Analisis Pengaruh Pelatihan Terhadap Produktivitas Kerja Karyawan Pada PT. Erajaya Swasembada Cabang Makasar. Skripsi. Universitas Hasanudin Makasar.

Santoso, S. (2018). Menguasai SPSS Versi 25. PT. Elex Media Komputindo Kelompok Gramedia, Anggota IKAPI, Jakarta.

Setiawati, R., Caehsa, M., & Badarusman, B. (2017). Utilisasi Quay Container Crane dan Produktivitas Bongkar Muat Peti Kemas Terhadap Effective Time Kapal Peti Kemas di Terminal Operasi 3 PT. Pelabuhan Tanjung Priok. Jurnal Manajemen Bisnis Transportasi dan Logistik, 4 (1), 45-56.

Sugiyono. (2019). Metode Penelitian Kuantitatif, Kualitatif dan R&D. ALFABETA, Yogyakarta.

Sujarweni, Wiratna, V. (2014). Metode Penelitian. Pustakabarupress. Yogyakarta.

Suryantoro, B., Purnama, D. W., & Haqi, M. (2020). Tenaga Kerja, Peralatan Bongkar Muat Lift On / Off, dan Efektivitas Lapangan Penumpukkan Terhadap Produktivitas Bongkar Muat Peti Kemas. Jurnal Baruna Horizon, 3 (1).

Triatmodjo, Bambang. (2020). Perencanaan Pelabuhan. Yogyakarta : Beta Offset.

Umagapi, B. W., Amonalisa, S., & Lesmini, L. (2016). Kualitas Pelayanan Dokumen dan Kecepatan Bongkar Muat General Cargo. Jurnal Manajemen Transportasi & Logistik (JMTransLog). 3 (3).

Utari, R. H. (2017). Kinerja Operator dan Peralatan Bongkar Muat Untuk Meningkatkan Handling Peti Kemas. Skripsi. STIA dan Manajemen Kepelabuhan Barunawati Surabaya.

Wimpi, D. (2019). Tenaga Kerja, Peralatan Bongkar Muat Lift On / Off dan Efektivitas Lapangan Penumpukan Terhadap Produktivitas Bongkar Muat Peti Kemas di Depo Spil. (Doctoral Dissertation, STIA Manajemen & Kepelabuhanan Barunawati Surabaya).

Downloads

Published

2022-10-28

How to Cite

Teguh Santoso, K., Fauzi, A., & Sri Sumantri, A. (2022). ANALISIS FAKTOR PENANGANAN PANDEMI COVID-19, KINERJA OPERATOR, PERALATAN BONGKAR MUAT DAN EFEKTIVITAS LAPANGAN PENUMPUKAN TERHADAP PRODUKTIVITAS BONGKAR MUAT PETI KEMAS. Profit: Jurnal Manajemen, Bisnis Dan Akuntansi, 1(4), 156–166. https://doi.org/10.58192/profit.v1i4.325